SIP Workshop Cairns July 2004

at joint APAN and Questnet conference

The ojective of these pages is to co-ordinate the team of individuals who are going to make this happen.

Action items:

The action items stem from what we have to get working to do the agenda listed below.

 

Storybook Agenda for the events of the workshop

 

The order of the agenda is under draft. It is not at all clear which order some things need to be done.

 

Duration

Who

What

Result

 

Day prior to start. Possibly in a staging room nearby if access to room is not available. Who Ensure basic network infrustructure is available
  • IP Network in room has access to outside (with basic security of lower ports)
  • Ample IP connections (with leads) are available for participants
  • Unix server(s) for participants are installed and guest usernames and passwords ready to pass out.
  • IP Telephones are distributed and tested with known good config
  • Connectivity to Gateway(s) and MCU works
  • The two presentation SIP servers are installed
  • Workshop http/ftp/dhcp/dns server running
  • IP Address space has been allocated (posted on wall)
 
Prior to start Who Ensure physical human ammenities are set up
  • Tables and chairs are arranged.
  • Paper and pens.
  • Coffee/Tea/Biscuits/Water are available.
  • Two projectors for slides etc